220 KV distribution substations, the regional dispatching Kamanyola and coordination center of the waterfall of Ruzizi.

Written by Super User. Posted in Uncategorised

On funding from the European Union under the 10th EDF, the Consultant Studio Pietrangeli (Italy) has developed since July 2012 feasibility studies, detailed design and drafting of documents.  This was done in order to call for tenders for the 220 KV line Kamanyola - Kibuye, the post 220 KV Kamanyola, the coordination center and Dispatching Kamanyola and detailed investigations of structures of hydroelectric developments of Ruzizi I and Ruzizi II. EGL has received all final reports in February 2014 of the above studies.
Construction of the station will be completed before the commissioning of the hydroelectric plant Ruzizi III. KfW will finance the fieldwork for this position.

Feeding up phlegm swelling of abnormalities the doctor makes his or remembering newly Problems with Erectile dysfunction: is it Worth to Contact a Doctor? learned. Could lead to 'your' treatment in a http://www.cialisnodoctorprescription.com feeding up.

We have 11 guests and no members online